The project will build a 500-kilovolt (kV)/220-kV substation at Dashte Alwan, which will connect to a 500-kV transmission line crossing the Hindukush mountains via the Salang Pass route. This will add 1,000 megawatts to the system and allow power imports from Tajikistan, Turkmenistan, and Uzbekistan.