Variable Renewable Energy Integration and Planning Study
Publication Details
The report is intended to answer the following critical questions for the future planning of the Pakistan electricity sector. The report presents the analysis and findings of a major study carried out over a period of 18 months involving all the key federal agencies involved in power system planning, led by the National Transmission and Despatch Company as the primary technical counterpart, with the findings reported to the Ministry of Energy (Power Division).