{"id":11755,"date":"2017-09-07T08:28:09","date_gmt":"2017-09-07T08:28:09","guid":{"rendered":"https:\/\/test0302.carecprogram.org\/?page_id=11755"},"modified":"2017-10-24T07:01:37","modified_gmt":"2017-10-24T07:01:37","slug":"pakistan-energy-snapshot-2015","status":"publish","type":"page","link":"https:\/\/carecprogram.org\/?page_id=11755","title":{"rendered":"Pakistan Energy Snapshot 2015"},"content":{"rendered":"<h2>Power Sector Snapshot (2015)<\/h2>\n<div class=\"pg-EnergySnapshot-Country pg-EnergySnapshot-Country-Pakistan md-EnergySnapshot-Snapshot\">\n<table class=\"tg-Table-RowBased\">\n<tbody>\n<tr class=\"tg-Row-Single\">\n<th>Installed capacity<\/th>\n<td colspan=\"2\">24,962 MW<\/td>\n<\/tr>\n<tr class=\"tg-Row-Multiple tg-Row-Multiple-1 tg-Row-MultiColumn tg-Row-Multiple-Start\">\n<th rowspan=\"4\">Generation Mix<\/th>\n<td>Thermal<\/td>\n<td>70%<\/td>\n<\/tr>\n<tr class=\"tg-Row-Multiple tg-Row-Multiple-1 tg-Row-MultiColumn\">\n<td>Hydro<\/td>\n<td>26%<\/td>\n<\/tr>\n<tr class=\"tg-Row-Multiple tg-Row-Multiple-1 tg-Row-MultiColumn\">\n<td>Nuclear<\/td>\n<td>3%<\/td>\n<\/tr>\n<tr class=\"tg-Row-Multiple tg-Row-Multiple-1 tg-Row-MultiColumn tg-Row-Multiple-End\">\n<td>Wind<\/td>\n<td>1%<\/td>\n<\/tr>\n<tr class=\"tg-Row-Single\">\n<th>Generation<\/th>\n<td colspan=\"2\">105,305 GWh<\/td>\n<\/tr>\n<tr class=\"tg-Row-Single\">\n<th>Consumption<\/th>\n<td colspan=\"2\">105,733 GWh<\/td>\n<\/tr>\n<tr class=\"tg-Row-Single\">\n<th>Export<\/th>\n<td colspan=\"2\">&#8211;<\/td>\n<\/tr>\n<tr class=\"tg-Row-Single\">\n<th>Import<\/th>\n<td colspan=\"2\">428 GWh<\/td>\n<\/tr>\n<tr class=\"tg-Row-Single\">\n<th colspan=\"3\">Others<\/th>\n<\/tr>\n<tr>\n<td colspan=\"3\">\n<ul>\n<li>Generation, transmission and distribution unbundled<\/li>\n<li>Water &amp; Power Development Authority (WAPDA) is responsible for water and hydropower development and Pakistan Electric Power Company (PEPCO) for thermal power generation, transmission and distribution<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p><!-- .pg-EnergySnapshot.md-EnergySnapshot-Snapshot --><\/p>\n<h2>Key power sector issues identified in the report (2016)<\/h2>\n<ul>\n<li>The power demand continues to outstrip power generation by a huge margin. As of 2014-15, the electricity generation was 15,500 MW against the demand of 21,000 MW<\/li>\n<li>The estimated losses of power transmission and distribution system is 23-25%. The National power policy envisages reduction in transmission and distribution losses from ~23-25% to ~16% by 2017<\/li>\n<li>An estimated 1\/3rd of national power generation capacity loss is on account of aging power plants and distribution infrastructure<\/li>\n<\/ul>\n<p><b>Source:<\/b> ADB TA 8727: Study for a Power Sector Financing Road Map within<br \/>\nCAREC<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Power Sector Snapshot (2015) Installed capacity 24,962 MW Generation Mix Thermal 70% Hydro 26% Nuclear 3% Wind 1% Generation 105,305 GWh Consumption 105,733 GWh Export &#8211; Import 428 GWh Others Generation, transmission and distribution unbundled Water &amp; Power Development Authority (WAPDA) is responsible for water and hydropower development and Pakistan Electric Power Company (PEPCO) for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":11718,"menu_order":7,"comment_status":"closed","ping_status":"closed","template":"page-energy-snapshots.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-11755","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/carecprogram.org\/index.php?rest_route=\/wp\/v2\/pages\/11755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/carecprogram.org\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/carecprogram.org\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/carecprogram.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/carecprogram.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11755"}],"version-history":[{"count":0,"href":"https:\/\/carecprogram.org\/index.php?rest_route=\/wp\/v2\/pages\/11755\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/carecprogram.org\/index.php?rest_route=\/wp\/v2\/pages\/11718"}],"wp:attachment":[{"href":"https:\/\/carecprogram.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}